027 935 5435
TAGS

Armourguard nz

Armour guard headquarters was constructed in 2017. This build was a highly sysfiticatoed build with a high level of detail and some serious foundations. The functionally of the build required heavy fortification and concrete construction.


  • SQM 1065
  • GEL Architects
  • Build duration 1 year